Ancon MBT Headed Anchors have been installed on a section of the Eastlink Project in Melbourne.
EastLink is a AU$3.8 billion road project which will deliver Melbourne's second fully-electronic tollway, comprising about 45 kilometres of freeway-standard road connecting the city's eastern and south-eastern suburbs. Major construction began in early 2005 and the road opened to traffic on Sunday 29 June 2008, five months ahead of the scheduled opening date.
Ancon MBT Headed Anchors are designed to provide dead end embedment for bars in concrete. This helps to reduce congestion and simplify the placement of rebars by removing the need for hooked ends. The anchor comprises half an MBT coupler with a plate welded to one end which carries the full tension load of the bar when it is bearing against the concrete. The MBT Headed Anchor also has the added advantage of requiring no special bar end preparation.
Related Products
Reinforcing Bar Couplers
Ancon reinforcing bar couplers can simplify the design and construction of reinforced concrete and reduce the amount of reinforcement required.
Latest News
Ancon 500 Tension System renamed to Halfen Detan-D
As a future-oriented, innovative company, Leviat focuses on the ever-changing requirements of the industry, and our latest development combines the portfolio of Ancon and Halfen Tension Systems to ensure we meet the individual requirements of our customers.
ICC-ES Appraisal Report Issued to Leviat
We are excited to announce the ICC Evaluation Service (ICC-ES) has issued the first appraisal report in New Zealand to Leviat for Halfen HZA Anchor Channels and HZS Channel Bolts.